碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === General hydropower engineering is far more complicated than construction, and the schedule of the former must follow that of the latter. Once the construction falls behind schedule, work period of hydropower engineering will be sharply compressed, causing fre...