Design and Implementation of Automatic Burn-in System for Dynamic Load Testing

碩士 === 國立臺北科技大學 === 電機工程研究所 === 105 === Because power supply unit (PSU) production requires operators to assemble it and then put that PSU on the shelf into the burn-in room, most of the burn-in operation keeps heavy load running 24 hours. This burn-in condition only keeps full load running, but ope...

Full description

Bibliographic Details
Main Authors: Hsien-Yu Kao, 高銜佑
Other Authors: Jin-Shyan Lee
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/zz2mjj