Analysis of Jacking force for EPB

碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 105 === Earth Pressure Balance system is a method which uses the combination of exca-vated soil material and impermeable bentonite stabilizing solution in order to provide stability at the cutting face of the EPB machine. The excavated material is then pumped to...

Full description

Bibliographic Details
Main Authors: Yi-Zhi Cai, 蔡佾志
Other Authors: P.E., Shong-loong Chen Ph.D.
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/xrxkej