The Case Study of Public Work Contract Disputes For Extension Period Caused by Change Order
碩士 === 國立雲林科技大學 === 營建工程系 === 105 === Abstract The characteristics of public works are huge funds, long construction periods and complex projects. During the construction period, change orders usually lead to extension period and result in contract disputes. This study collected construction contrac...