Development of a Project Risk-Level Management System
博士 === 中華大學 === 土木工程學系 === 106 === The traditional cost-based Earned Value Management (EVM) method and the related Earned Schedule Management (ESM) for construction project schedule control were founded on the basis of Planned Value (PV). Such cost-based methods have an inevitable weakness that wh...