The Study of Equipment Unexpected Downtime - A Case Study of JI Process in TFT-LCD Manufacturing

碩士 === 朝陽科技大學 === 工業工程與管理系 === 106 === For the production line with automatic equipment, it may cause production line breakdown, system stop action and other problems if an unexpected (or abnormal) downtime is occurred and then it results in longer production cycle time, less output quantity, and mo...

Full description

Bibliographic Details
Main Authors: PENG, YU-RU, 彭昱儒
Other Authors: CHENG, CHUN-YUAN
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/6yc448