Application of the API 581 Level 2 Guidelines to Consequence Analysis of Equipment Leaks
碩士 === 國立高雄第一科技大學 === 環境與安全衛生工程系碩士班 === 106 === The consequence analysis in the Risk-Based Inspection (API RBI) assessment is performed to develop equipment/pipeline inspection plans . API 580/581 issued by the American Petroleum Institute is the RBI's technology development document.Two levels...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/ee7zqf |