The Study of Automated Material Handling System Phase in Bumping 300mm Processing

碩士 === 國立高雄大學 === 電機工程學系-電子構裝整合技術產業碩士專班 === 106 === This study is aimed at introducing the technical application of automatic dispatching, dispatching logic and from to optimal handling path calculation for the 300 mm wafer level package bump process automation handling system. Through the machine a...

Full description

Bibliographic Details
Main Authors: CHIU, SHIU-CHENG, 邱士城
Other Authors: SHIH, MING-CHANG
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/uv2rqe
id ndltd-TW-106NUK01442014
record_format oai_dc
spelling ndltd-TW-106NUK014420142019-05-16T00:37:22Z http://ndltd.ncl.edu.tw/handle/uv2rqe The Study of Automated Material Handling System Phase in Bumping 300mm Processing 晶圓級封裝凸塊製程300mm物料搬運系統導入評估相關性研究 CHIU, SHIU-CHENG 邱士城 碩士 國立高雄大學 電機工程學系-電子構裝整合技術產業碩士專班 106 This study is aimed at introducing the technical application of automatic dispatching, dispatching logic and from to optimal handling path calculation for the 300 mm wafer level package bump process automation handling system. Through the machine automation program, the machine status is immediately collected, and the reward is given to the real-time dispatching system. When the dispatching system receives the correct instruction, it dispatches the work industry. Then the material control system receives the dispatching instruction and immediately issues the command to dispatch the vehicle. The car process is carried out by the dispatching logic to calculate the optimal transport path, so that the transport path is carried at the shortest distance. The Overhead Shuttle (OHS) is used for unloading and unloading to ensure the safety of moving materials and vehicles, and to transport the 300mm boat box from the designated machine through the automatic handling mode. The load port is sent to the specified stocker or sent from the specified stocker to the specified machine load port mode, which makes the factory handling operation more efficient and uses the calculation of “from to” to make the path of the dice to be optimal and the shortest, and thus reduce the 300mm boat box transfer time. SHIH, MING-CHANG LIN, CHUNG-MIN 施明昌 林忠民 2018 學位論文 ; thesis 63 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄大學 === 電機工程學系-電子構裝整合技術產業碩士專班 === 106 === This study is aimed at introducing the technical application of automatic dispatching, dispatching logic and from to optimal handling path calculation for the 300 mm wafer level package bump process automation handling system. Through the machine automation program, the machine status is immediately collected, and the reward is given to the real-time dispatching system. When the dispatching system receives the correct instruction, it dispatches the work industry. Then the material control system receives the dispatching instruction and immediately issues the command to dispatch the vehicle. The car process is carried out by the dispatching logic to calculate the optimal transport path, so that the transport path is carried at the shortest distance. The Overhead Shuttle (OHS) is used for unloading and unloading to ensure the safety of moving materials and vehicles, and to transport the 300mm boat box from the designated machine through the automatic handling mode. The load port is sent to the specified stocker or sent from the specified stocker to the specified machine load port mode, which makes the factory handling operation more efficient and uses the calculation of “from to” to make the path of the dice to be optimal and the shortest, and thus reduce the 300mm boat box transfer time.
author2 SHIH, MING-CHANG
author_facet SHIH, MING-CHANG
CHIU, SHIU-CHENG
邱士城
author CHIU, SHIU-CHENG
邱士城
spellingShingle CHIU, SHIU-CHENG
邱士城
The Study of Automated Material Handling System Phase in Bumping 300mm Processing
author_sort CHIU, SHIU-CHENG
title The Study of Automated Material Handling System Phase in Bumping 300mm Processing
title_short The Study of Automated Material Handling System Phase in Bumping 300mm Processing
title_full The Study of Automated Material Handling System Phase in Bumping 300mm Processing
title_fullStr The Study of Automated Material Handling System Phase in Bumping 300mm Processing
title_full_unstemmed The Study of Automated Material Handling System Phase in Bumping 300mm Processing
title_sort study of automated material handling system phase in bumping 300mm processing
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/uv2rqe
work_keys_str_mv AT chiushiucheng thestudyofautomatedmaterialhandlingsystemphaseinbumping300mmprocessing
AT qiūshìchéng thestudyofautomatedmaterialhandlingsystemphaseinbumping300mmprocessing
AT chiushiucheng jīngyuánjífēngzhuāngtūkuàizhìchéng300mmwùliàobānyùnxìtǒngdǎorùpínggūxiāngguānxìngyánjiū
AT qiūshìchéng jīngyuánjífēngzhuāngtūkuàizhìchéng300mmwùliàobānyùnxìtǒngdǎorùpínggūxiāngguānxìngyánjiū
AT chiushiucheng studyofautomatedmaterialhandlingsystemphaseinbumping300mmprocessing
AT qiūshìchéng studyofautomatedmaterialhandlingsystemphaseinbumping300mmprocessing
_version_ 1719168753190567936