Risk Allocation in Jacking Method for Underground Lines Based on Geotechnical Investigation Report
碩士 === 國立中央大學 === 營建管理研究所在職專班 === 107 === Differences between site conditions and that shown in the geotechnical investigation report are reasons often seen that cause extensions of time or design changes. A false or wrong geotechnical investigation report is always an unavoidable reason leading to...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/344ep8 |