Statistical procedures for development of real-time statistical process control (SPC) in lumber manufacturing
High raw material costs and reduced allowable forest harvest levels have created challenges for the Canadian lumber industry. Sawlogs typically comprise 75% of all the costs in a sawmill and insufficient log availability is a widespread problem. Thus, maximum product value and yield from every log p...
Main Author: | |
---|---|
Language: | English |
Published: |
2009
|
Online Access: | http://hdl.handle.net/2429/17233 |