Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba

The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size an...

Full description

Bibliographic Details
Main Author: Rotzien, Joey Lou
Language:English
Published: University of British Columbia 2010
Subjects:
Online Access:http://hdl.handle.net/2429/29751