Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba
The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size an...
Main Author: | |
---|---|
Language: | English |
Published: |
University of British Columbia
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/2429/29751 |