Applying the virtual structure of a risk-informed decision making framework for operating small hydropower reservoirs during high inflow events, case study : Cheakamus River system
Operating hydropower reservoirs with small storage capacity is a challenging task due to the fact that in a watershed system there usually exist multiple stakeholders with different and conflicting preferences and values. Consequently the process of planning for reservoir operation must be carried o...
Main Author: | |
---|---|
Language: | English |
Published: |
University of British Columbia
2012
|
Online Access: | http://hdl.handle.net/2429/43587 |