CFD modelling of Bergeforsen's spillway with ice cover

The latest spillway in Bergeforsen was finished in 2014. It has a 25 metres wide spillway opening capable of discharging 1500 m^3/s at full reservoir retention level. The overflow chute ends in a 35 metres wide and 100 metres long stilling basin which then converges into 25 metres wide curved tunnel...

Full description

Bibliographic Details
Main Authors: Jonsson, Simon, Wessling, Albin
Format: Others
Language:English
Published: Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik 2018
Subjects:
CFD
GCI
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-71265