CFD modelling of Bergeforsen's spillway with ice cover
The latest spillway in Bergeforsen was finished in 2014. It has a 25 metres wide spillway opening capable of discharging 1500 m^3/s at full reservoir retention level. The overflow chute ends in a 35 metres wide and 100 metres long stilling basin which then converges into 25 metres wide curved tunnel...
Main Authors: | , |
---|---|
Format: | Others |
Language: | English |
Published: |
Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik
2018
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-71265 |