Head Race Tunnel Melado Hydropower Plant, Chile : Optimization in Excavation and Rock Support

The present thesis is to focus on the two head race tunnels within the Melado HPP, Chile. The upstream tunnel is called Castillo 7800 m long and the downstream tunnel is called Vallical 8800 m long.The feasibility study of this project was carried in 2010. The resulting report from this study was us...

Full description

Bibliographic Details
Main Author: Manquehual, Cristobal
Format: Others
Language:English
Published: Norges teknisk-naturvitenskapelige universitet, Institutt for geologi og bergteknikk 2012
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-20103