Head Race Tunnel Melado Hydropower Plant, Chile : Optimization in Excavation and Rock Support
The present thesis is to focus on the two head race tunnels within the Melado HPP, Chile. The upstream tunnel is called Castillo 7800 m long and the downstream tunnel is called Vallical 8800 m long.The feasibility study of this project was carried in 2010. The resulting report from this study was us...
Main Author: | Manquehual, Cristobal |
---|---|
Format: | Others |
Language: | English |
Published: |
Norges teknisk-naturvitenskapelige universitet, Institutt for geologi og bergteknikk
2012
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-20103 |
Similar Items
-
STABILTY ASSESSMENT OF HEADRACE TUNNEL SYSTEM FOR PUNATSANGCHHU II HYDROPOWER PROJECT, BHUTAN
by: Tshering, Karma
Published: (2012) -
The Potential for Pumped Storage Hydropower Development in Mid-Norway. : D1-2012-48
by: Capon, Bruno
Published: (2012) -
3D NUMERICAL INVESTIGATION ON SETTLING BASIN LAYOUT : A case study on Mai Khola Hydropower Project, Nepal
by: Shrestha, Bishwo Vijaya
Published: (2012) -
Pumped Storage Development in Øvre Otra, Norway
by: Rognlien, Lars Marius
Published: (2012) -
Stabilitet av betongdammer - Ruhetens påvirkning på skjærkapasiteten mellom betong og berg
by: Liahagen, Simen Alexander
Published: (2012)