Stability and redundancy studies on the electrical grid on Gotland with respect to 500 MW of new wind power and a VSC HVDC link to the mainland
The electric grid of Gotland is connected to the mainland via a 90 km HVDC Classic bipole of 2 * 130 MW. The HVDC link balances the load and production on the island to maintain the frequency within limits, the load varies between 50 and 180 MW throughout the year. The power production on the island...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
Uppsala universitet, Elektricitetslära
2013
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-204659 |