Improving Stability by Enhancing Critical Fault Clearing Time
The Bulk Electric System (BES) in the United States includes transmission lines of 100kV and above, transformers of 100kV and above on Low Voltage (LV) side and generating units that step up to 100 kV and above. The BES is a power network that connects different states and utility companies via tie...
Main Author: | |
---|---|
Format: | Others |
Published: |
Scholar Commons
2019
|
Subjects: | |
Online Access: | https://scholarcommons.usf.edu/etd/7793 https://scholarcommons.usf.edu/cgi/viewcontent.cgi?article=8990&context=etd |