Resource Requirements Determination (Based on Statistical Methods)

Two methods of determining resource requirements at an Air Force maintenance depot were developed. The first method is designed for new workloads and is based on infinite queuing theory formulas. Tables have been developed for this method. The second method is designed for workload with, at minimum,...

Full description

Bibliographic Details
Main Author: Howard, Robert L.
Format: Others
Published: DigitalCommons@USU 1971
Subjects:
Online Access:https://digitalcommons.usu.edu/etd/6843
https://digitalcommons.usu.edu/cgi/viewcontent.cgi?article=7934&context=etd