Effect of verification core hole on the point bearing capacity of drilled shafts
For many projects involving drilled shafts, cores are required to be taken below the shaft base for visual identification of the underlying material. For example, the Texas Department of Transportation (TxDOT) requires a core length of at least 1.5 m (5 ft) or equal to the shaft diameter, whichever...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/2152/18183 |