A comparison between predictive and formative cost-effectiveness evaluation techniques for the assessment of lecture and computer-based multimedia training

In an effort to validate a predictive (as opposed to a traditional formative or summative) cost-effectiveness model, a study was conducted to evaluate Kearsley and Compton's (1981) Benefits Model. Costs were input into the model as they applied to the design, development, and dissemination of t...

Full description

Bibliographic Details
Main Author: Neale, Vicki L.
Other Authors: Industrial and Systems Engineering
Format: Others
Language:en
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/39644
http://scholar.lib.vt.edu/theses/available/etd-10052007-143237/