Adaptive out of step relay algorithm

A peninsular power company's extra high voltage (EHV) transmission grid and the rest of the country behave as a two machine system for the following two types of disturbances loss of a large generator in the southern region of the peninsular power company faults on the 500 kV interconnection...

Full description

Bibliographic Details
Main Author: Turner, Steven Primitivo
Other Authors: Electrical Engineering
Format: Others
Language:en
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/40747
http://scholar.lib.vt.edu/theses/available/etd-01242009-063244/