Sequencing policy for a CONWIP production system

<p>The optimization of the performance of a constant Work-in-Progress (CONWIP) production system through the sequencing of its backlog list is investigated. The performance measures considered are throughput, optimum WIP level (m*), and flow time. Analysis of the effects of sequence dependent...

Full description

Bibliographic Details
Main Author: Greco, Michael P.
Other Authors: Industrial and Systems Engineering
Format: Others
Language:en
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/44485
http://scholar.lib.vt.edu/theses/available/etd-08292008-063311/