Leadtime estimation in a manufacturing shop environment

<p>This research examines the relationships between the independent variables; lot size, sequencing rule, and shop type/product mix and the â dependent variables; work-in-process, machine utilization, flowtime, and leadtime. These relationships have seldom been investigated by academician...

Full description

Bibliographic Details
Main Author: Srihari, Krishnaswami
Other Authors: Industrial Engineering and Operations Research
Format: Others
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/45684
http://scholar.lib.vt.edu/theses/available/etd-11142012-040325/