An economic study of the present feedwater treatment system at the V.P.I. power plant
The purpose of this thesis was to study the economical aspects of the present boiler feed water treating system at the VPI Power Plant. In carrying out the investigation, two testing periods were conducted, each lasting for four weeks and the first period was preliminary in nature. The experimenta...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
Virginia Polytechnic Institute
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/76119 |