Dynamic Probability Control Limits for Risk-Adjusted Bernoulli Cumulative Sum Charts

The risk-adjusted Bernoulli cumulative sum (CUSUM) chart developed by Steiner et al. (2000) is an increasingly popular tool for monitoring clinical and surgical performance. In practice, however, use of a fixed control limit for the chart leads to quite variable in-control average run length (ARL) p...

Full description

Bibliographic Details
Main Author: Zhang, Xiang
Other Authors: Statistics
Format: Others
Published: Virginia Tech 2017
Subjects:
Online Access:http://hdl.handle.net/10919/77889