Short-term operation of surface reservoirs within long-term goals.
A stochastic dynamic programming model (called P.B.S.D.P.) based on the consideration of peak discharge and time between peaks as two stochastic variables has been used to model and to solve a reservoir operation problem. This conceptualization of the physical reality allows to solve, in this order,...
Main Author: | |
---|---|
Other Authors: | |
Language: | en |
Published: |
The University of Arizona.
1989
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/184854 |