Optimal operation of water-supply systems
The traditional water-supply planning problem is characterized by two main steps: (1) project future water requirements based on present rates of economic growth, 'and (2) schedule water development projects to be introduced into the system on time to meet these predicted requirements. If alter...
Main Author: | |
---|---|
Language: | en |
Published: |
The University of Arizona.
1970
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/190970 |