Interactive open-pit design using parameterization techniques
The standard approach to open pit design is to optimize the pit shape using the criterion of maximum total profit on the basis of a revenue block model of the orebody. There are some difficult problems inherent in such an approach. For example, scheduling and production rates will have a significant...
Main Author: | |
---|---|
Other Authors: | |
Published: |
University of Leeds
1997
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.606382 |