Superconducting Transformer Design and Construction
This thesis first outlines the testing undertaken on a partial core superconducting transformer under open circuit, short circuit, full load and endurance test conditions. During the endurance test, a failure occurred after 1 minute and 35 seconds. During the failure, voltage dipping and rapid liqui...
Main Author: | |
---|---|
Language: | en |
Published: |
University of Canterbury. Electrical and Computer Engineering
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10092/4977 |