Pre-signal study at an at-grade intersection with separate right-turn phase

Thesis (MScEng)--Stellenbosch University, 2015. === ENGLISH ABSTRACT: Capacity waste happens when right-turn vehicles have right-of-way during a separate right-turn phase and lanes (e.g., through lanes) of the same approach of the intersection cannot discharge vehicles during that green phase. Rig...

Full description

Bibliographic Details
Main Author: Tang, Hao
Other Authors: Andersen, Johann
Format: Others
Language:en_ZA
Published: Stellenbosch : Stellenbosch University 2015
Subjects:
Online Access:http://hdl.handle.net/10019.1/96484