Optimizing crushing plant performance using a dynamic simulation

The primary crushing circuit at Premier Diamond Mine was simulated to improve operating costs and diamond recovery. Due to surges in certain feed streams a dynamic simulation was done. The applicability of the general-purpose simulator, Siman 4, for simulating a metallurgical plant is evaluated in t...

Full description

Bibliographic Details
Main Author: Du Plessis, Ian
Other Authors: Prof R F Sandenbergh
Published: 2013
Subjects:
Online Access:http://hdl.handle.net/2263/30595
Du Plessis, I 1994, Optimizing crushing plant performance using a dynamic simulation, MEng dissertation, University of Pretoria, Pretoria, viewed yymmdd < http://hdl.handle.net/2263/30595 >
http://upetd.up.ac.za/thesis/available/etd-01112006-090928/