Optimizing crushing plant performance using a dynamic simulation
The primary crushing circuit at Premier Diamond Mine was simulated to improve operating costs and diamond recovery. Due to surges in certain feed streams a dynamic simulation was done. The applicability of the general-purpose simulator, Siman 4, for simulating a metallurgical plant is evaluated in t...
Main Author: | |
---|---|
Other Authors: | |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/2263/30595 Du Plessis, I 1994, Optimizing crushing plant performance using a dynamic simulation, MEng dissertation, University of Pretoria, Pretoria, viewed yymmdd < http://hdl.handle.net/2263/30595 > http://upetd.up.ac.za/thesis/available/etd-01112006-090928/ |