Evaluation of two different mechanized earth moving technologies truck and shovel and IPCC for handling material from a large open pit mine using requesite design and operational conditions, efficiency, cost , skills and safety as criteria using sishen iron ore mine as a case study

An advanced coursework and a project submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, in partial fulfilment of the requirements of MSc. Engineering (Mining), November 2015 === General For mining operations, both underground and open...

Full description

Bibliographic Details
Main Author: Banda, Nelson
Format: Others
Language:en
Published: 2016
Subjects:
Online Access:Banda, Nelson (2015) Evaluation of two different mechanized earth moving technologies: truck and shovel and IPCC for handling material from a large open pit mine using requesite design and operational conditions, efficiency, cost, skills and safety as criteria using Sishen Iron Ore Mine as a case study, University of Witwatersrand, Johannesburg, <http://wiredspace.wits.ac.za/handle/10539/20589>
http://hdl.handle.net/10539/20589