Development of experimental facility for Roll-on Roll-off ramp isolation dynamics.
It has been determined that a high stress state occurs in the Roll-on Roll-off (RORO) ship offload stem ramp during vehicle transfers in Sea State 3 conditions. Motion compensation systems (i.e. isolators) between the ramp and the barge (RRDF) are needed to minimize the high stress levels in the ram...
Main Author: | |
---|---|
Other Authors: | |
Published: |
2012
|
Online Access: | http://hdl.handle.net/10945/10883 |