The Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting.
When a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of...