Timelining the Construction in Immersive Virtual Reality System Using BIM Application
Architectural, Engineering, and Construction (AEC) industry has been using 4D construction models (graphical illustration of the construction of a 3D building design with time as the 4th dimension) for many years to improve an existing construction schedule by identifying inconsistencies and out of...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1969.1/151003 |