Transient and Pseudosteady-State Productivity of Hydraulically Fractured Well

Numerical simulation method is used in this work to solve the problem of transient and pseudosteady-state flow of fluid in a rectangular reservoir with impermeable boundaries. Development and validation of the numerical solution for various well-fracture configurations are the main objectives of thi...

Full description

Bibliographic Details
Main Author: Lumban Gaol, Ardhi
Other Authors: Valko, Peter P.
Format: Others
Language:en_US
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/1969.1/ETD-TAMU-2012-08-11775