A Comparison of Predicted Brace Loads in Temporary Retaining Structures and Observed Brace Loads in Two Full Scale Test Sections
This thesis presents analyses of the results of a geotechnical instrumentation program performed by Eustis Engineering Company for the U.S. Army Corps of Engineers (USACE) during the construction of two covered canals in New Orleans, Louisiana. At each site, a cast-in-place concrete culvert was c...
Main Author: | |
---|---|
Format: | Others |
Published: |
ScholarWorks@UNO
2003
|
Subjects: | |
Online Access: | http://scholarworks.uno.edu/td/51 http://scholarworks.uno.edu/cgi/viewcontent.cgi?article=1050&context=td |