Robust optimization vs. stochastic programming incorporating risk measures for unit commitment with uncertain variable renewable generation

Unit commitment seeks the most cost effective generator commitment schedule for an electric power system to meet net load, defined as the difference between the load and the output of renewable generation, while satisfying the operational constraints on transmission system and generation resources....

Full description

Bibliographic Details
Main Authors: Hamzeei, M. (Author), Kazemzadeh, N. (Author), Ryan, S.M (Author)
Format: Article
Language:English
Published: Springer Verlag 2019
Subjects:
Online Access:View Fulltext in Publisher